Name of Project: Overhaul of DGS uphole unit enclosures
Clients:
Peabody’s Metropolitan Colliery, South 32, Simec, Australian Drilling Systems, Mitchell Services, Cougar
Timeframe:
CMS has been working on DGS enclosures for the past five years
Details of the project:
CMS Asia Pacific carries out maintenance overhauls of DGS uphole unit enclosures. The enclosures require mandatory maintenance every four years as determined by the NSW Resources Regulator. CMS is licenced by the NSW Resources Regulator to undertake work on flameproof equipment and has a team of qualified, expert technicians who work on the Underground In-Seam long hole directional drilling survey tools.

The overhaul process includes:
- Determining baseline condition of the equipment and establishing a minimum level of operation
- Verifying if there is any damage and removing any damaged glass
- Measuring enclosures and completing AS3800 inspections
- Inspecting and testing external I.S. cables and sockets and replacing glands as required under the AS/NZS 3800 Standard.
- Reassembling and testing
What value does this project provide:
Maintenance of the DGS enclosures mitigates risk by ensuring accurately placed holes are drilled safely. It also ensures continued, safe coal production.
CMS credentials:
- CMS APAC NPG is a Licensed Workshop as issued by the NSW Resources Regulator
- Licence number MLA 073367
- The above is based on the Certificate of Recognition issued under the ANZEx Scheme
- Certificate number ANZExSF 21.1117
- CMS APAC NPG has a QUALITY MANAGEMENT SYSTEM that complies with
- ISO 9001:2015